Guess where I'll be going for attachment? KPE site at kallang!
will be under hot sun with yellow helmet and boots! *scream*
________________________________
attachment period: 4 sep 06 - 10 feb 07
Company: 

Position: Quantity surveyor
Work scope: contract administration, site visit, valuation/measurement, cashflow projections, payment recommendation blah blah blah...
in short... I'll be dealing with numbers and calculation!
Pay: $440/mth (CHEAP LABOUR!)
Working hours: 8.30am to 6.30pm - Longgggggggg sia..
Project: Kallang/Paya Lebar Expressway (KPE)
________________________________
The 12-km KPE will stretch from the East Coast Parkway (ECP) in the south to the Tampines Expressway (TPE) in the North East. To be built at an estimated cost of S$1.8 billion, the expressway includes about 9 km of tunnel, which will be the longest underground expressway in South East Asia.

12km long!
Completed portion of KPE tunnel
ps: Whenever you all use KPE in the future, remember I play a part in the completion of it! ;)
-yuemei
1 comment:
top [url=http://www.001casino.com/]001[/url] coincide the latest [url=http://www.casinolasvegass.com/]online casino[/url] autonomous no deposit bonus at the foremost [url=http://www.baywatchcasino.com/]no deposit tip
[/url].
Post a Comment